Daytime Noise Monitoring Results -- Normal weekday          
Station M8, Wah Lai House                  
Date Start Time End Time  Weather Noise level (dB(A)), 30 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
03-Nov-11 10:44 11:14 Sunny 65 67 63 Cement loading, operation of excvator  Road Traffic noise from Shek Pai Wan Road and operation of mobile crane at oppostie construction site N.A 26.0 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
07-Nov-11 13:25 13:55 Sunny 68 69 63 Operation of excavator Road Traffic noise from Shek Pai Wan Road and operation of mobile crane at oppostie construction site N.A 25.8 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
17-Nov-11 14:00 14:30 Cloudy 70 73 64 Operation of excavator Road Traffic noise from Shek Pai Wan Road and operation of mobile crane at oppostie construction site N.A 23.4 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 2385180
23-Nov-11 09:55 10:25 Cloudy 69 73 64 Loading Road Traffic noise from Shek Pai Wan Road and operation of mobile crane at oppostie construction site, drilling in pocess near cement factory N.A 22.0 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 2385180
29-Nov-11 13:35 14:05 Sunny 66 67 65 Loading and rock out Road Traffic noise from Shek Pai Wan Road and operation of mobile crane at oppostie construction site, drilling in pocess near cement factory N.A 22.7 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 2385180
      Min. 65                
      Max. 70